We have successfully developed the supply of more than 20,000 Tons of Activated Carbon for use in drinking water treatment, waste water and mining in Uruguay, Argentina and Peru.
Coal has:
We have the capacity to make large deliveries, or to store in our covered warehouses and deliver according to the demand of our clients.
As a trusted supplier of Centrales de la Costa, Genersol provided spare parts for the LM6000 Turbines installed in 9 de Julio Power Plant.
On this occasion, we supplied eighty-seven items totaling over $700,000, ranging from: T48 Thermocouples, High Pressure Injection Pump, HPB60 Hydraulic Pressure Booster, Speed Sensor, to Nuts and Gaskets. All equipment met our client's technical requirements.
Securing and fulfilling this contract demands having a broad, specialized, and reliable pool of suppliers, which Genersol possesses.
This contract once again demonstrates our ability to adapt to our clients' specific needs, both technically and financially, adjusting to Argentina's current challenging payment conditions.
At Genersol, we work on innovative, quality solutions to drive the long-term success of this project.
In 2022, ENEL executed a tender process for the acquisition of valves with actuators. They wanted to buy valves from renowned brands such as Eagle Industry, Durco, Velan, Newco, Powell, PBV, in sizes ranging from 2” to 24” and class specifications extending from 150 to 2,500.
Following the competitive tender, a long term agreement was formalized with GENERSOL, who already delivered a batch in 2023, and have an ongoing production for a new batch.
On this occasion, GENERSOL once again demonstrated its technical capability by working together with Central Costanera in defining each of the valves to be quoted, as they involved different brands, materials, sizes, series, type of actuator, etc.
It also demonstrated its financial capacity by undertaking a 3-year contract for over U$S 2.5 million in an environment of total economic uncertainty and financing needs as demanded by the Argentine market in 2022 and today.
We deeply appreciate Enel Central Costanera for trusting in our expertise. This milestone is possible due to the dedication and hard work of our team, which once again demonstrated its ability to meet the highest quality standards.
At Genersol, we believe that every project is an opportunity to strengthen long-term relationships. This successful collaboration reinforces our position as trusted suppliers and consolidates us as a strategic partner for the sustainable development of the energy infrastructure in Latin America.
We supply spare parts for the VibroSystM monitoring systems for CELEPSA's El Platanal plant
We supply critical spare parts for the Unitrol 6800 excitation system of the Francis G4 CH Machupicchu turbine.
We have made the supply of spare parts for the Philadelphia Gear brand gearbox for UTE - Central Térmica la Tablada - Uruguay.
Original shaft and gear sets were supplied for the accessory gearbox (accessory drive) of the General Electric Frame 9001E turbines.
P108, P202, P203, P206, P207, P209, P210, P220,
NK 80-200/188, NK 65-200/198, NK 65-160/177, among others associated with the demineralized water production plant of the ENEL Atacama plant.
We supply:
For pumps from:
Various clients: UTE – Uruguay, EDESUR, ENEL – Argentina, EGESUR – Peru – Year 2009 to date.
Throughout the last 12 years, our company has supplied multiple power transformers in Uruguay, as well as in Argentina, Chile and Peru of 20, 25, 40, 63, 80 MVA in 150 kV from different factories depending on the market and the technical characteristic of the supply.
Client Proelectrica – Colombia – Year 2018
In 2018 we supplied a new rotor for the BRUSH BDAX7 generator that was manufactured in Brush Czech Republic and transported by air to Colombia with a stopover in Germany.
When passing through Germany, the rotor was inspected by German customs, where due to a bad practice by the customs officer, when cutting the packaging, the same damage was done to the rotor exciter winding.
This situation caused that upon arrival in Colombia it was necessary to disassemble the exciter, take it to the Brush workshop in Pittsburgh and repair it.
Client – UTE – Uruguay – Year 2015
We have supplied 2 three-phase banks 425 MVA reserve in 500 kV, these being the largest transformers installed in Uruguay.
They have gas monitoring and fiber optics to detect hot spots, as well as an integrated monitoring system.
Our company participated in the design, the design review, the factory tests, international and national transport, unloading, assembly and commissioning.
The UTE Punta del Tigre I plant consists of 6 LM6000 with Brush BDAX7 generators.
We have supplied a spare rotor with its corresponding sarcophagus that allows, in addition to safe transport, to be stored for years in an isolated nitrogen atmosphere.
The UTE CTR La Tablada plant consists of 2 Frame 9 Brush BDAX9 generators.
We have supplied a spare rotor with its corresponding sarcophagus that allows, in addition to safe transport, to be stored for years in an isolated nitrogen atmosphere.
We have supplied Kallpa Generación with 3600 meters of API 5L PSL1 X52 seamless carbon steel pipe, with FBE external coating, beveled ends with protective plugs and with API 5L PSL1 and 5CT manufacturing standards.
As usual, we take care of both the supply, factory tests, supervision of packaging and shipping conditions, as well as international freight, deposit and local freight to the AGUAYTÍA ENERGY DEL PERÚ GAS PLANT plant and the corresponding unloading on the ground. indicated by the client.
We have supplied clients in Uruguay, Argentina, Chile, Bolivia and Peru with pipes, sheets, angles, tubes and bars of:
Carbon steel.Stainless steel.Hot-dip galvanized steel.Painted in black or unpainted.Three-layer steel.
Complying with Standard Norms:: AISI, API, ASTM, BS, DIN | Serie: 201, 202, 304, 304L, 304H, 310S, 316, 316L, 317L, 321, 310S ,309S, 400 | series: 410, 410S,420, 430, 431, 440A, 904L
In all measures.
Delivered in containers, as loose cargo, unloaded at the plant, etc.